Categories Uncategorised Analysis of waste production potential and material flows in the municipality of Jistebník Post author By integraconsadmin Post date 4th October 2024 ← Technical support in ex post evaluation of cohesion policy programmes 2014-2020 financed by the ERDF and the Cohesion Fund (Work package 8 – Transport and Energy Network Infrastructures) → Preparation of the environmental impact assessment notification in the scope of Annex 3 pursuant to Act No. 100/2001 Coll., as amended, for the Bernartice wind power plant construction project